Pistol Toolhead Set Up (Page 3)
Station 2 - Installation of the powder measure assembly (Figure 32)

1.  Use a 5/32" Allen wrench to loosen the two collar clamp screws  and remove the powder die Figure 33 & 34.
2. Screw the powder die into Station 2. Stop when the die is flush with the bottom of the toolhead Figure 35.
3. Remove the powder funnel Figure 36  from the bag containing the locator buttons.

About Powder Funnels:
  In Figure 37 are two examples of the many powder funnels available for the XL 650. On the left is a typical pistol caliber funnel. On the right, a rifle or bottle-necked type. The bottom of the rifle-style
funnel fits snugly over the neck of the case, allowing powder to drop in without spilling (the rifle-style powder funnel does not bell the mouth of the case). The bottom of the pistol funnel, on the other hand, fits inside and actually expands and bells as it guides the powder into the case. Powder funnels are caliber specific, so be sure you have the correct funnel
by referring to the caliber conversion chart.

4.  Insert the funnel into the die Figure38. Make sure that you insert the funnel into the die with the grooved end up. The funnel should move up and down freely.
5.  Remove the lid and the protective  cardboard tube from the powder measure and place it onto the powder die Figure 39. Turn down the two clamp screws until they are snug. Then loosen them slightly. The measure should move freely atop the die.

figure_032a.jpg (9616 bytes)

Figure 32

figure_033a.jpg (11821 bytes)

Figure 33

figure_034a.jpg (7714 bytes)

Figure 34

figure_035a.jpg (4295 bytes)

Figure 35

figure_036a.jpg (1892 bytes)

Figure 36

figure_037a.gif (5188 bytes)

Figure 37

figure_038a.gif (8306 bytes)

Figure 38

figure_039a.jpg (9616 bytes)

Figure 39

Next...