Pistol Toolhead Set Up (Page 1)
Station 1 - Installing the size/decap die

Warning Never attempt to de-prime live primers, an explosion may result in serious injury or even death.

  To set up the toolhead you'll need to have empty brass,bullets, primers, powder and a loading manual.
1.  Raise the platform, by pulling the handle toward you and all the way down.
2. Screw the sizing die into Station 1. Continue to screw the die down until it just touches the shellplate. Tighten the die lockring finger tight  Now lower the platform by raising the handle to its upright position.
3. Place a case in the casefeed funnel. The case a should drop to the casefeed arm bushing.
4. Raise the platform. The inserter cam pushes the feed arm bushing over the body, dropping the case onto the Station 1 locator.
5.  Lower the platform. The case is inserted into Station 1.
  After raising the handle, insure that you push the handle away from you to it's stop. Figure 28. This will insure that the case is fully inserted into Station 1.
6.  Again, raise the platform. The case is now sized. If the case has a spent primer, it will be deprimed. Leave the platform in the raised position with the case fully inserted in the die. This will ensure that the die remains in alignment when tightening the lockring.
7. Using a 1-1/8" wrench to turn the lockring and a 7/8" wrench to hold the die body, tighten the lockring Figure 29.

figure_025a.gif (20218 bytes)

Figure 25

figure_028a.jpg (9317 bytes)

Figure 28

figure_029a.gif (12136 bytes)

Figure 29

Next...