Carefully
remove your new Square Deal "B" from its packaging. Set the small parts aside.
All of the Square Deal "B" parts are shown and designated by a part
number on the schematic pages. The parts in the following instructions are identified by
the same part number, so should you get lost, you can find them on the schematic.Figure 1 Install the ejected cartridge
chute bracket (#13659) with two large screws (#13976) from the parts bag.
 |
| Figure 1 |
Figure 2 Using the machine itself
as a template, mark the three mounting holes. Allow about one foot on both sides of your
Square Deal "B" for working room. Make sure your bench is sturdy and does not
shake, as this may disturb your powder charge and primer system.
 |
| Figure 2 |
|
|
Figure
3 Drill the mounting holes and secure the Square Deal "B" to your
bench, using 1/4" bolts (not supplied).
 |
| Figure 3 |
Figure 4 Install the return
bracket (#13355) between the bottom of the shaft (#13437) and the spent primer chute
(#13594). The spent primer cup (#13651) simply hooks on the bottom of the chute.
 |
| Figure 4 |
Figure 5 Slide the cartridge
collection box (#13756) onto the chute bracket (#13659) as shown.
 |
| Figure 5 |
|